Hydrogen pipeline in North Sea Port

The project is temporarily on hold. No studies or fieldwork will be conducted at this time. This decision may change depending on market conditions.

Key figures

  • The pipeline will be built in the following municipalities: Gent, Evergem, Zelzate, Lochristi
  • Length: 33.7 km
  • Diameter: 600 mm

Documents

You can download the presentations (in Dutch) from the various information sessions here:

 

Infosessions

You can download the presentations as part of the application for an environmental permit: